Fabric Development
Choose materials against the brief.
Fabric development begins with the intended use, hand feel, weight and care routine. Review composition and construction alongside availability, color matching and any performance evidence required.
YOUR STARTING POINT
What to send.
01
Composition and fabric weight targets
02
Physical fabric or color reference
03
Laundering conditions
04
Required performance tests
DEVELOPMENT CHECKPOINTS
What to review.
01
Fabric sourcing review
02
Swatches and lab dips
03
Sample-garment evaluation
04
Approved material reference
Decisions to resolve early
Evaluate the fabric after care, not only from a swatch. Shrinkage, shade change, stretch recovery and surface appearance can alter the finished garment.
What approval should cover
A fabric supplier statement is not automatically evidence for a finished garment claim. Agree which tests are needed and whether they apply to the fabric, trims or complete garment.
- Minimum order
- 100 pieces per style, per color, with a mix of 4 sizes
- Sample development
- 7–12 days for simple styles; 15–20 days for complex styles
- Bulk production
- Calculated according to style and order quantity

CONNECTED SERVICES
Build a complete development plan.
Have a Uniform or Adaptive Apparel Project?
Send us your reference images, tech pack, measurements or product concept. Our team can evaluate materials, construction and sampling options.