BUILT TO YOUR SPECIFICATION. MADE FOR YOUR PEOPLE.OEM / ODM · PRIVATE LABEL · 100 PCS / STYLE / COLOR
Fabric Development

Choose materials against the brief.

Fabric development begins with the intended use, hand feel, weight and care routine. Review composition and construction alongside availability, color matching and any performance evidence required.

YOUR STARTING POINT

What to send.

01

Composition and fabric weight targets

02

Physical fabric or color reference

03

Laundering conditions

04

Required performance tests

DEVELOPMENT CHECKPOINTS

What to review.

01

Fabric sourcing review

02

Swatches and lab dips

03

Sample-garment evaluation

04

Approved material reference

Decisions to resolve early

Evaluate the fabric after care, not only from a swatch. Shrinkage, shade change, stretch recovery and surface appearance can alter the finished garment.

What approval should cover

A fabric supplier statement is not automatically evidence for a finished garment claim. Agree which tests are needed and whether they apply to the fabric, trims or complete garment.

Minimum order
100 pieces per style, per color, with a mix of 4 sizes
Sample development
7–12 days for simple styles; 15–20 days for complex styles
Bulk production
Calculated according to style and order quantity
Request a Quote
Fabric cutting operation on a marked pattern
LET’S BUILD YOUR NEXT PROGRAM

Have a Uniform or Adaptive Apparel Project?

Send us your reference images, tech pack, measurements or product concept. Our team can evaluate materials, construction and sampling options.

Request a Quote